Consider the following scenario:
- You configure a scheduled task on a Windows 8.1 or Windows Server 2012 R2-based computer.
- The Run task as soon as possible after a scheduled start is missed setting of the task is selected.
- The task starts as scheduled.
- You restart the computer immediately.