Notice: This website is an unofficial Microsoft Knowledge Base (hereinafter KB) archive and is intended to provide a reliable access to deleted content from Microsoft KB. All KB articles are owned by Microsoft Corporation. Read full disclaimer for more details.

Entries in the "Prod. Order Capacity Need" dialog box are calculated incorrectly in Microsoft Dynamics NAV 2013


View products that this article applies to.

This article applies to Microsoft Dynamics NAV for all countries and all language locales.

↑ Back to the top


Symptoms

Assume that you add a working day shift that exceeds midnight in a shop floor calendar in Microsoft Dynamics NAV 2013. When you validate the corresponding production order routing in the Prod. Order Capacity Need dialog box, entries in the Prod. Order Capacity Need dialog box are calculated incorrectly.

↑ Back to the top


Resolution

Hotfix information

A supported hotfix is now available from Microsoft. However, it is only intended to correct the problem that is described in this article. Apply it only to systems that are experiencing this specific problem. This hotfix may receive additional testing. Therefore, if you are not severely affected by this problem, we recommend that you wait for the next Microsoft Dynamics NAV 2013 service pack or the next Microsoft Dynamics NAV version that contains this hotfix.

Note In special cases, charges that are ordinarily incurred for support calls may be canceled if a Technical Support Professional for Microsoft Dynamics and related products determines that a specific update will resolve your problem. The usual support costs will apply to additional support questions and issues that do not qualify for the specific update in question.

↑ Back to the top


Installation information

Microsoft provides programming examples for illustration only, without warranty either expressed or implied. This includes, but is not limited to, the implied warranties of merchantability or fitness for a particular purpose. This article assumes that you are familiar with the programming language that is being demonstrated and with the tools that are used to create and to debug procedures. Microsoft support engineers can help explain the functionality of a particular procedure. However, they will not modify these examples to provide added functionality or construct procedures to meet your specific requirements.

Note Before you install this hotfix, verify that all Microsoft Dynamics NAV client users are logged off the system. This includes Microsoft Dynamics NAV Application Server (NAS) services. You should be the only client user who is logged on when you implement this hotfix.

To implement this hotfix, you must have a developer license.

We recommend that the user account in the Windows Logins window or in the Database Logins window be assigned the "SUPER" role ID. If the user account cannot be assigned the "SUPER" role ID, you must verify that the user account has the following permissions:
  • The Modify permission for the object that you will be changing.
  • The Execute permission for the System Object ID 5210 object and for the System Object ID 9015

    object.
Note You do not have to have rights to the data stores unless you have to perform data repair.

Code changes

Note Always test code fixes in a controlled environment before you apply the fixes to your production computers.

To resolve this problem, follow these steps:
  1. Change the code in the CreateLoadForward function in the Calculate Routing Line codeunit (99000774) as follows:
    Existing code 1
    ...
    FirstInBatch := FALSE;
    FirstEntry := FALSE;
    END;

    // Delete the following lines.
    IF (EndingTime = 000000T) AND (AvQty <> 0) THEN
    // Ending Time reached 24:00:00 so we need to move date as well
    CalendarEntry.Date := CalendarEntry.Date + 1;
    // End of the deleted lines.

    IF UpdateDates THEN BEGIN
    ProdOrderRoutingLine."Starting Time" := CalendarEntry."Starting Time";
    ProdOrderRoutingLine."Starting Date" := CalendarEntry.Date;
    ...
    Replacement code 1
    ...
    FirstInBatch := FALSE;
    FirstEntry := FALSE;
    END;
    IF UpdateDates THEN BEGIN
    ProdOrderRoutingLine."Starting Time" := CalendarEntry."Starting Time";
    ProdOrderRoutingLine."Starting Date" := CalendarEntry.Date;
    ...
    Existing code 2
    ...
    ProdOrderRoutingLine."Starting Date" := CalendarEntry.Date;
    UpdateDates := FALSE;
    END;
    ProdStartingTime := EndingTime;
    ProdStartingDate := CalendarEntry.Date;
    ProdOrderRoutingLine."Ending Time" := EndingTime;
    ...
    Replacement code 2
    ...
    ProdOrderRoutingLine."Starting Date" := CalendarEntry.Date;
    UpdateDates := FALSE;
    END;

    // Add the following lines.
    IF (EndingTime = 000000T) AND (AvQty <> 0) THEN
    // Ending Time reached 24:00:00 so we need to move date as well
    CalendarEntry.Date := CalendarEntry.Date + 1;
    // End of the added lines.

    ProdStartingTime := EndingTime;
    ProdStartingDate := CalendarEntry.Date;
    ProdOrderRoutingLine."Ending Time" := EndingTime;
    ...
  2. Change the code in the Calculate Planning Route Line Codeunit (99000810) as follows:
    Existing code 1
    ...
    AvQty *
    CalendarMgt.TimeFactor(WorkCenter."Unit of Measure Code") *
    100 / RelevantEfficiency / ConCurrCap,1,'>');

    // Delete the following lines.
    IF (EndingTime = 000000T) AND (AvQty <> 0) THEN
    // Ending Time reached 24:00:00 so we need to move date as well
    CalendarEntry.Date := CalendarEntry.Date + 1;
    // End of the deleted lines.

    RemainNeedQty := RemainNeedQty - AvQty;
    IF Write THEN BEGIN
    ...
    Replacement code 1
    ...
    AvQty *
    CalendarMgt.TimeFactor(WorkCenter."Unit of Measure Code") *
    100 / RelevantEfficiency / ConCurrCap,1,'>');

    RemainNeedQty := RemainNeedQty - AvQty;
    IF Write THEN BEGIN
    ...
    Existing code 2
    ...
    PlanningRoutingLine."Starting Date" := CalendarEntry.Date;
    UpdateDates := FALSE;
    END;
    ProdStartingTime := EndingTime;
    ProdStartingDate := CalendarEntry.Date;
    PlanningRoutingLine."Ending Time" := EndingTime;
    ...
    Replacement code 2
    ...
    PlanningRoutingLine."Starting Date" := CalendarEntry.Date;
    UpdateDates := FALSE;
    END;

    // Add the following lines.
    IF (EndingTime = 000000T) AND (AvQty <> 0) THEN
    // Ending Time reached 24:00:00 so we need to move date as well
    CalendarEntry.Date := CalendarEntry.Date + 1;
    // End of the added lines.

    ProdStartingTime := EndingTime;
    ProdStartingDate := CalendarEntry.Date;
    PlanningRoutingLine."Ending Time" := EndingTime;
    ...

Prerequisites

You must have Microsoft Dynamics NAV 2013 installed to apply this hotfix.

Removal information

You cannot remove this hotfix.

↑ Back to the top


Status

Microsoft has confirmed that this is a problem in the Microsoft products that are listed in the "Applies to" section.

↑ Back to the top


Note This is a "FAST PUBLISH" article created directly from within the Microsoft support organization. The information contained herein is provided as-is in response to emerging issues. As a result of the speed in making it available, the materials may include typographical errors and may be revised at any time without notice. See Terms of Usefor other considerations.

↑ Back to the top


Keywords: kbqfe, kbmbspartner, kbmbsmigrate, kbmbsquickpub, kbsurveynew, kbnoloc, kbmbscodefix, kb

↑ Back to the top

Article Info
Article ID : 2803240
Revision : 1
Created on : 1/7/2017
Published on : 1/23/2013
Exists online : False
Views : 229