Consider the following scenario in Cash Manager in Microsoft Dynamics SL.
In this scenario, the EP document is not included in the report. However, the void check (VC) document is included in the report. This makes the report total incorrect.
- In Manual Check/Payment Entry (03.030.00) in Accounts Payable, you select Electronic Payment for Type to pay a voucher or vouchers.
- In Void Check Entry (03.040.00), you void the electronic payment (EP) document.
- You print Bank Reconciliation Report (20.630.00) in Cash Manager.
In this scenario, the EP document is not included in the report. However, the void check (VC) document is included in the report. This makes the report total incorrect.