Consider the following scenario in Bill of Material in Microsoft Dynamics SL 7.0 Service Pack 3 (SP3):
- You create a bill of material that contains a second-level subassembly on the Bill of Material Maintenance (11.250.00) screen.
- You create a production entry document for the bill of material on the Production Entry (11.010.00) screen.
- You click the Components button to open the Production Entry BOM Structure (11.010.01) screen, and then you click the Component Entry button to open the Component Entry (11.011.00) screen.
- You review the values in the Use From Stock Qty box.