Consider the following scenarios in Project Controller in Microsoft Dynamics SL 7.0.
Scenario 1
- You enter a value in the Acct Category box in the Bill to a Maximum Setup tab in the Project Controller Setup (PA.SET.00) screen.
- You enter the same value in the Over Max Adjustment Acct Category box.
Scenario 2
- You enter a value in the Over Max Adjustment Acct Category box in the Bill to a Maximum Setup tab in the Project Controller Setup (PA.SET.00) screen.
- You enter the same value in the Over Max Adjustment Acct Category box on a different detail line.